Search every field
Partial results: at least one source did not answer. Available results are shown rather than treating an upstream outage as zero matches.
Source status
- crossref
- europe-pmc
- datacite
- pubmed
- doaj
- zenodo
- hal
- arxiv
- doab
Cyclic Scheduling of Flexible Job-shop with Time Window Constraints and Resource Capacity Constraints
uncertain
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- supportingMetadata completeness: All 6 scored descriptive metadata groups are present.
Hybrid Grey Wolf Optimizer with discrete prism dispersion strategy for solving flexible job-shop scheduling problem.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
An improved whale optimization algorithm for flexible job shop scheduling problems with machine deterioration effects.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Dynamic-opposite learning enhanced meta-heuristic approach for solving multiple industrial optimization problems.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Energy-aware flexible job shop scheduling under time-of-use pricing with renewable, battery storage and preventive maintenance.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Effects of AI explanations on trust and reliance: a study in job shop scheduling.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
A Hierarchical Optimization Algorithm With Dual-Cache Synced Tuning Mechanism for Distributed Flexible Job Shop Scheduling Problem.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
A Knowledge-Enhanced Evolutionary Multitasking Memetic Algorithm for Multimodal Multiobjective Flexible Job Shop Scheduling Considering Speed.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Genetic Programming with Tabu List for Dynamic Flexible Job Shop Scheduling.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Knowledge-driven teaching-learning-based optimization algorithm for bi-objective flexible job-shop scheduling problem with tool allocation.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
A novel multi-objective dynamic flexible job shop scheduling algorithm using reinforced learning based black widow spider algorithm.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Reinforcement learning-controlled differential evolution with L-BFGS refinements.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
A hybrid genetic Tabu search algorithm for minimising total completion time in a flexible job-shop scheduling problem
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Does Size Generalization Imply Disruption Robustness? A Pre-Registered Study of GNN–PPO Scheduling Policies for the Dynamic Flexible Job-Shop Problem
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- cautionPublication version: Identified as a preprint; peer review and later versions may change the record.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Solving the flexible job-shop scheduling problem based on the hierarchical collaborative evolution multi-objective artificial raindrop algorithm
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- cautionPublication version: Identified as a preprint; peer review and later versions may change the record.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
A Genetic Algorithm with Critical‑Path‑Driven Dual‑Neighborhood Search for Flexible Job Shop Scheduling
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- cautionPublication version: Identified as a preprint; peer review and later versions may change the record.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Improved Hybrid Genetic Algorithm for Solving Multi-Objective Flexible Job Shop Scheduling Problem
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- cautionPublication version: Identified as a preprint; peer review and later versions may change the record.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Multi-Objective Distributed Flexible Job Shop Schedulingwith Transfer Based on Critical Path Graph Guided DRL
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- cautionPublication version: Identified as a preprint; peer review and later versions may change the record.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
BLAST: Bottleneck-Free Large-Scale Algorithm Scheduling Throughput A Streamlined Approach to the Flexible Job Shop Problem (FJSP)
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- cautionPublication version: Identified as a preprint; peer review and later versions may change the record.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
A New Framework for Job Shop Integrated Scheduling and Vehicle Path Planning Problem.
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Complex Job-Shop Scheduling with Batching in Semiconductor Manufacturing
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Sur l’ordonnancement d’ateliers job-shop flexibles et flow-shop en industries pharmaceutiques : optimisation par algorithmes génétiques et essaims particulaires
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Méthodes et outils pour l'ordonnancement d'ateliers avec prise en compte des contraintes additionnelles : énergétiques et environnementales
limited evidence
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Flexible job-shop problem with predictive maintenance planning using genetic algorithm
limited evidence
Show all credibility signals
- not scoredDOI registered: Not checked or no result supplied; no credibility inference made.
- not scoredDOI resolves: Not checked or no result supplied; no credibility inference made.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch expression of concern: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch correction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch reinstatement: Not checked or no result supplied; no credibility inference made.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Flexible Job-Shop Scheduling with Batching for Semiconductor Manufacturing
uncertain
Show all credibility signals
- not scoredDOI registered: Not checked or no result supplied; no credibility inference made.
- not scoredDOI resolves: Not checked or no result supplied; no credibility inference made.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch expression of concern: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch correction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch reinstatement: Not checked or no result supplied; no credibility inference made.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Integration of transportation constraints in the flexible job-shop scheduling problem
uncertain
Show all credibility signals
- not scoredDOI registered: Not checked or no result supplied; no credibility inference made.
- not scoredDOI resolves: Not checked or no result supplied; no credibility inference made.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch expression of concern: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch correction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch reinstatement: Not checked or no result supplied; no credibility inference made.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Ordonnancement des systèmes flexibles avec contrainte de blocage
uncertain
Show all credibility signals
- not scoredDOI registered: Not checked or no result supplied; no credibility inference made.
- not scoredDOI resolves: Not checked or no result supplied; no credibility inference made.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch expression of concern: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch correction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch reinstatement: Not checked or no result supplied; no credibility inference made.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Robust scheduling with stochastic processing times in flexible job-shops
uncertain
Show all credibility signals
- not scoredDOI registered: Not checked or no result supplied; no credibility inference made.
- not scoredDOI resolves: Not checked or no result supplied; no credibility inference made.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch expression of concern: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch correction: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch reinstatement: Not checked or no result supplied; no credibility inference made.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.