Solving a new bi-objective mathematical model for a hybrid flow shop scheduling problem with robots and fuzzy maintenance time

Ali Ghodratnama, Mehdi Amiri-Aref, Reza Tavakkoli-Moghaddam

Open source

DOI
10.1016/j.cie.2023.109349
Published
2023-08
Container
Computers & Industrial Engineering
Publisher
Elsevier BV
Open access
unknown

Credibility signals

uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.1016/j.cie.2023.109349,
  title = {Solving a new bi-objective mathematical model for a hybrid flow shop scheduling problem with robots and fuzzy maintenance time},
  author = {Ali Ghodratnama and Mehdi Amiri-Aref and Reza Tavakkoli-Moghaddam},
  year = {2023},
  journal = {Computers \& Industrial Engineering},
  doi = {10.1016/j.cie.2023.109349},
  url = {https://doi.org/10.1016/j.cie.2023.109349}
}

RIS

TY  - JOUR
TI  - Solving a new bi-objective mathematical model for a hybrid flow shop scheduling problem with robots and fuzzy maintenance time
AU  - Ali Ghodratnama
AU  - Mehdi Amiri-Aref
AU  - Reza Tavakkoli-Moghaddam
PY  - 2023
JO  - Computers & Industrial Engineering
DO  - 10.1016/j.cie.2023.109349
UR  - https://doi.org/10.1016/j.cie.2023.109349
ER  - 

APA

Ghodratnama, A., Amiri-Aref, M., & Tavakkoli-Moghaddam, R. (2023). Solving a new bi-objective mathematical model for a hybrid flow shop scheduling problem with robots and fuzzy maintenance time. Computers & Industrial Engineering. https://doi.org/10.1016/j.cie.2023.109349

Source records