Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects

Chhatra Bahadur Basnet, Krishna Kanta Panthi

Open source

DOI
10.1016/j.jrmge.2017.12.002
Published
2018-06
Container
Journal of Rock Mechanics and Geotechnical Engineering
Publisher
Elsevier BV
Open access
unknown

Credibility signals

uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.1016/j.jrmge.2017.12.002,
  title = {Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects},
  author = {Chhatra Bahadur Basnet and Krishna Kanta Panthi},
  year = {2018},
  journal = {Journal of Rock Mechanics and Geotechnical Engineering},
  doi = {10.1016/j.jrmge.2017.12.002},
  url = {https://doi.org/10.1016/j.jrmge.2017.12.002}
}

RIS

TY  - JOUR
TI  - Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects
AU  - Chhatra Bahadur Basnet
AU  - Krishna Kanta Panthi
PY  - 2018
JO  - Journal of Rock Mechanics and Geotechnical Engineering
DO  - 10.1016/j.jrmge.2017.12.002
UR  - https://doi.org/10.1016/j.jrmge.2017.12.002
ER  - 

APA

Basnet, C. B., & Panthi, K. K. (2018). Analysis of unlined pressure shafts and tunnels of selected Norwegian hydropower projects. Journal of Rock Mechanics and Geotechnical Engineering. https://doi.org/10.1016/j.jrmge.2017.12.002

Source records