Short-term load forecasting using a two-stage CPO-PSO hyperparameter optimization of LSSVM.

Zhang X

Open source

DOI
10.1038/s41598-026-55227-z
Published
2026 Jun 18
Container
Scientific reports
Publisher
Not recorded
Open access
yes

Credibility signals

limited evidence Score 45/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.1038/s41598-026-55227-z,
  title = {Short-term load forecasting using a two-stage CPO-PSO hyperparameter optimization of LSSVM.},
  author = {Zhang X},
  year = {2026},
  journal = {Scientific reports},
  doi = {10.1038/s41598-026-55227-z},
  url = {https://doi.org/10.1038/s41598-026-55227-z}
}

RIS

TY  - JOUR
TI  - Short-term load forecasting using a two-stage CPO-PSO hyperparameter optimization of LSSVM.
AU  - Zhang X
PY  - 2026
JO  - Scientific reports
DO  - 10.1038/s41598-026-55227-z
UR  - https://doi.org/10.1038/s41598-026-55227-z
ER  - 

APA

X, Z. (2026). Short-term load forecasting using a two-stage CPO-PSO hyperparameter optimization of LSSVM.. Scientific reports. https://doi.org/10.1038/s41598-026-55227-z

Source records