Integrated Berth Allocation and Quay Crane Assignment With Uncertain Maintenance Activities
- DOI
- 10.1109/iesm45758.2019.8948115
- Published
- 2019-09
- Container
- 2019 International Conference on Industrial Engineering and Systems Management (IESM)
- Publisher
- IEEE
- Open access
- unknown
Credibility signals
uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- supportingDOI registered: A matching record was returned by Crossref.
- supportingDOI resolves: A matching record was returned by Crossref.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- supportingMetadata completeness: All 6 scored descriptive metadata groups are present.
Cite this work
BibTeX
@article{allodium:10.1109/iesm45758.2019.8948115,
title = {Integrated Berth Allocation and Quay Crane Assignment With Uncertain Maintenance Activities},
author = {Ying Li and Feng Chu and Feifeng Zheng and Imed Kacem},
year = {2019},
journal = {2019 International Conference on Industrial Engineering and Systems Management (IESM)},
doi = {10.1109/iesm45758.2019.8948115},
url = {https://doi.org/10.1109/iesm45758.2019.8948115}
}RIS
TY - JOUR TI - Integrated Berth Allocation and Quay Crane Assignment With Uncertain Maintenance Activities AU - Ying Li AU - Feng Chu AU - Feifeng Zheng AU - Imed Kacem PY - 2019 JO - 2019 International Conference on Industrial Engineering and Systems Management (IESM) DO - 10.1109/iesm45758.2019.8948115 UR - https://doi.org/10.1109/iesm45758.2019.8948115 ER -
APA
Li, Y., Chu, F., Zheng, F., & Kacem, I. (2019). Integrated Berth Allocation and Quay Crane Assignment With Uncertain Maintenance Activities. 2019 International Conference on Industrial Engineering and Systems Management (IESM). https://doi.org/10.1109/iesm45758.2019.8948115
Source records
- crossref · retrieved 2026-11-10T12:39:13.669Z