A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE
- DOI
- 10.1142/s0217595909002419
- Published
- 2009-10
- Container
- Asia-Pacific Journal of Operational Research
- Publisher
- World Scientific Pub Co Pte Lt
- Open access
- unknown
Credibility signals
uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- supportingDOI registered: A matching record was returned by Crossref.
- supportingDOI resolves: A matching record was returned by Crossref.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- supportingMetadata completeness: All 6 scored descriptive metadata groups are present.
Cite this work
BibTeX
@article{allodium:10.1142/s0217595909002419,
title = {A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE},
author = {FETHI JARRAY},
year = {2009},
journal = {Asia-Pacific Journal of Operational Research},
doi = {10.1142/s0217595909002419},
url = {https://doi.org/10.1142/s0217595909002419}
}RIS
TY - JOUR TI - A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE AU - FETHI JARRAY PY - 2009 JO - Asia-Pacific Journal of Operational Research DO - 10.1142/s0217595909002419 UR - https://doi.org/10.1142/s0217595909002419 ER -
APA
JARRAY, F. (2009). A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE. Asia-Pacific Journal of Operational Research. https://doi.org/10.1142/s0217595909002419
Source records
- crossref · retrieved 2026-11-10T13:03:14.724Z