RETRACTED: Prefabricated construction process and unloading monitoring of space steel grid cassettle structure multi-storey large-span gymnasium
- DOI
- 10.1177/0020720920983542
- Published
- 2021-01-20
- Container
- International Journal of Electrical Engineering & Education
- Publisher
- SAGE Publications
- Open access
- unknown
Credibility signals
serious concern Score 29/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- supportingDOI registered: A matching record was returned by Crossref.
- supportingDOI resolves: A matching record was returned by Crossref.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- serious concernRetraction Watch retraction: 1 retraction notice matched this DOI.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- supportingMetadata completeness: All 6 scored descriptive metadata groups are present.
Cite this work
BibTeX
@article{allodium:10.1177/0020720920983542,
title = {RETRACTED: Prefabricated construction process and unloading monitoring of space steel grid cassettle structure multi-storey large-span gymnasium},
author = {Jing Chen and Kejian Ma and Jianchun Xiao and Yanhui Wei and Hongniao Chen and Yaqin Lu},
year = {2021},
journal = {International Journal of Electrical Engineering \& Education},
doi = {10.1177/0020720920983542},
url = {https://doi.org/10.1177/0020720920983542}
}RIS
TY - JOUR TI - RETRACTED: Prefabricated construction process and unloading monitoring of space steel grid cassettle structure multi-storey large-span gymnasium AU - Jing Chen AU - Kejian Ma AU - Jianchun Xiao AU - Yanhui Wei AU - Hongniao Chen AU - Yaqin Lu PY - 2021 JO - International Journal of Electrical Engineering & Education DO - 10.1177/0020720920983542 UR - https://doi.org/10.1177/0020720920983542 ER -
APA
Chen, J., Ma, K., Xiao, J., Wei, Y., Chen, H., & Lu, Y. (2021). RETRACTED: Prefabricated construction process and unloading monitoring of space steel grid cassettle structure multi-storey large-span gymnasium. International Journal of Electrical Engineering & Education. https://doi.org/10.1177/0020720920983542
Source records
- crossref · retrieved 2026-09-25T08:43:01.561Z