Resource constrained project scheduling formulation for optimization of product input sequence and workforce scheduling for multi-stage multi-product cellular production lines
- DOI
- 10.1299/jamdsm.2024jamdsm0062
- Published
- 2024
- Container
- Journal of Advanced Mechanical Design, Systems, and Manufacturing
- Publisher
- Japan Society of Mechanical Engineers
- Open access
- unknown
Credibility signals
uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- supportingDOI registered: A matching record was returned by Crossref.
- supportingDOI resolves: A matching record was returned by Crossref.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- supportingMetadata completeness: All 6 scored descriptive metadata groups are present.
Cite this work
BibTeX
@article{allodium:10.1299/jamdsm.2024jamdsm0062,
title = {Resource constrained project scheduling formulation for optimization of product input sequence and workforce scheduling for multi-stage multi-product cellular production lines},
author = {Tatsushi NISHI and Hidefumi KURAKADO and Ziang LIU},
year = {2024},
journal = {Journal of Advanced Mechanical Design, Systems, and Manufacturing},
doi = {10.1299/jamdsm.2024jamdsm0062},
url = {https://doi.org/10.1299/jamdsm.2024jamdsm0062}
}RIS
TY - JOUR TI - Resource constrained project scheduling formulation for optimization of product input sequence and workforce scheduling for multi-stage multi-product cellular production lines AU - Tatsushi NISHI AU - Hidefumi KURAKADO AU - Ziang LIU PY - 2024 JO - Journal of Advanced Mechanical Design, Systems, and Manufacturing DO - 10.1299/jamdsm.2024jamdsm0062 UR - https://doi.org/10.1299/jamdsm.2024jamdsm0062 ER -
APA
NISHI, T., KURAKADO, H., & LIU, Z. (2024). Resource constrained project scheduling formulation for optimization of product input sequence and workforce scheduling for multi-stage multi-product cellular production lines. Journal of Advanced Mechanical Design, Systems, and Manufacturing. https://doi.org/10.1299/jamdsm.2024jamdsm0062
Source records
- crossref · retrieved 2026-11-10T16:35:53.934Z