Minimizing total costs for distribution power grids considering harmonics and uncertainty of wind speed and solar radiation.
- DOI
- 10.1371/journal.pone.0355399
- Published
- 2026
- Container
- PloS one
- Publisher
- Not recorded
- Open access
- yes
Credibility signals
uncertain Score 53/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- supportingDirectory of Open Access Journals: A matching record was returned by DOAJ.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Cite this work
BibTeX
@article{allodium:10.1371/journal.pone.0355399,
title = {Minimizing total costs for distribution power grids considering harmonics and uncertainty of wind speed and solar radiation.},
author = {Kien LC and Phu ND and Nguyen TT and Pham TD and Duong MP},
year = {2026},
journal = {PloS one},
doi = {10.1371/journal.pone.0355399},
url = {https://doi.org/10.1371/journal.pone.0355399}
}RIS
TY - JOUR TI - Minimizing total costs for distribution power grids considering harmonics and uncertainty of wind speed and solar radiation. AU - Kien LC AU - Phu ND AU - Nguyen TT AU - Pham TD AU - Duong MP PY - 2026 JO - PloS one DO - 10.1371/journal.pone.0355399 UR - https://doi.org/10.1371/journal.pone.0355399 ER -
APA
LC, K., ND, P., TT, N., TD, P., & MP, D. (2026). Minimizing total costs for distribution power grids considering harmonics and uncertainty of wind speed and solar radiation.. PloS one. https://doi.org/10.1371/journal.pone.0355399
Source records
- pubmed · retrieved 2026-09-25T23:02:51.529Z
- europe-pmc · retrieved 2026-09-25T23:02:51.550Z
- doaj · retrieved 2026-09-25T23:02:51.551Z