Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards.
- DOI
- 10.1371/journal.pone.0357406
- Published
- 2026
- Container
- PloS one
- Publisher
- Not recorded
- Open access
- yes
Credibility signals
limited evidence Score 45/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Cite this work
BibTeX
@article{allodium:10.1371/journal.pone.0357406,
title = {Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards.},
author = {Wang H and Xu C and Hou Y and Zhang J and Liu Z},
year = {2026},
journal = {PloS one},
doi = {10.1371/journal.pone.0357406},
url = {https://doi.org/10.1371/journal.pone.0357406}
}RIS
TY - JOUR TI - Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards. AU - Wang H AU - Xu C AU - Hou Y AU - Zhang J AU - Liu Z PY - 2026 JO - PloS one DO - 10.1371/journal.pone.0357406 UR - https://doi.org/10.1371/journal.pone.0357406 ER -
APA
H, W., C, X., Y, H., J, Z., & Z, L. (2026). Optimization of multi-objective flexible scheduling for container rail mounted gantry cranes in railway logistics yards.. PloS one. https://doi.org/10.1371/journal.pone.0357406
Source records
- pubmed · retrieved 2026-11-10T11:00:46.273Z