Obstacle Removal Design and Construction Scheme for Metro Tunnel Undercrossing Existing Stations in Water-Rich Sand Strata on the First Yangtze River Terrace
- DOI
- 10.16037/j.1007-869x.20255667
- Published
- 8
- Container
- Chengshi guidao jiaotong yanjiu
- Publisher
- Not recorded
- Open access
- yes
Credibility signals
uncertain Score 53/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- supportingDirectory of Open Access Journals: A matching record was returned by DOAJ.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Cite this work
BibTeX
@article{allodium:10.16037/j.1007-869x.20255667,
title = {Obstacle Removal Design and Construction Scheme for Metro Tunnel Undercrossing Existing Stations in Water-Rich Sand Strata on the First Yangtze River Terrace},
author = {Bing ZHOU and Dongjun ZHOU and Xiaolong LI and Zhu XIONG},
year = {2026},
journal = {Chengshi guidao jiaotong yanjiu},
doi = {10.16037/j.1007-869x.20255667},
url = {https://doi.org/10.16037/j.1007-869x.20255667}
}RIS
TY - JOUR TI - Obstacle Removal Design and Construction Scheme for Metro Tunnel Undercrossing Existing Stations in Water-Rich Sand Strata on the First Yangtze River Terrace AU - Bing ZHOU AU - Dongjun ZHOU AU - Xiaolong LI AU - Zhu XIONG PY - 2026 JO - Chengshi guidao jiaotong yanjiu DO - 10.16037/j.1007-869x.20255667 UR - https://doi.org/10.16037/j.1007-869x.20255667 ER -
APA
ZHOU, B., ZHOU, D., LI, X., & XIONG, Z. (2026). Obstacle Removal Design and Construction Scheme for Metro Tunnel Undercrossing Existing Stations in Water-Rich Sand Strata on the First Yangtze River Terrace. Chengshi guidao jiaotong yanjiu. https://doi.org/10.16037/j.1007-869x.20255667
Source records
- doaj · retrieved 2026-09-25T19:27:37.848Z