Performance Comparison of Lump-Sum Design-Build (DB) and Progressive Design-Build (PDB) Methods in Infrastructure Projects

Tavares CB, Shrestha PP.

Open source

DOI
10.20944/preprints202609.1391.v1
Published
2026-09-16
Container
Not recorded
Publisher
Not recorded
Open access
no

Credibility signals

limited evidence Score 39/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.20944/preprints202609.1391.v1,
  title = {Performance Comparison of Lump-Sum Design-Build (DB) and Progressive Design-Build (PDB) Methods in Infrastructure Projects},
  author = {Tavares CB and  Shrestha PP.},
  year = {2026},
  doi = {10.20944/preprints202609.1391.v1},
  url = {https://doi.org/10.20944/preprints202609.1391.v1}
}

RIS

TY  - JOUR
TI  - Performance Comparison of Lump-Sum Design-Build (DB) and Progressive Design-Build (PDB) Methods in Infrastructure Projects
AU  - Tavares CB
AU  -  Shrestha PP.
PY  - 2026
DO  - 10.20944/preprints202609.1391.v1
UR  - https://doi.org/10.20944/preprints202609.1391.v1
ER  - 

APA

CB, T., & PP., S. (2026). Performance Comparison of Lump-Sum Design-Build (DB) and Progressive Design-Build (PDB) Methods in Infrastructure Projects. https://doi.org/10.20944/preprints202609.1391.v1

Source records