Integrated Optimization of Aircraft Line Maintenance: Scheduling under Uncertainty and Predictive Part Failure Modelling

Dionysios Peteinatos, Konstantia Kontodimou, Vassilios Andronis, Konstantinos Kepaptsoglou

Open source

DOI
10.21203/rs.3.rs-9568678/v1
Published
2026-09-21
Container
Not recorded
Publisher
Springer Science and Business Media LLC
Open access
unknown

Credibility signals

uncertain Score 60/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.21203/rs.3.rs-9568678/v1,
  title = {Integrated Optimization of Aircraft Line Maintenance: Scheduling under Uncertainty and Predictive Part Failure Modelling},
  author = {Dionysios Peteinatos and Konstantia Kontodimou and Vassilios Andronis and Konstantinos Kepaptsoglou},
  year = {2026},
  doi = {10.21203/rs.3.rs-9568678/v1},
  url = {https://doi.org/10.21203/rs.3.rs-9568678/v1}
}

RIS

TY  - JOUR
TI  - Integrated Optimization of Aircraft Line Maintenance: Scheduling under Uncertainty and Predictive Part Failure Modelling
AU  - Dionysios Peteinatos
AU  - Konstantia Kontodimou
AU  - Vassilios Andronis
AU  - Konstantinos Kepaptsoglou
PY  - 2026
DO  - 10.21203/rs.3.rs-9568678/v1
UR  - https://doi.org/10.21203/rs.3.rs-9568678/v1
ER  - 

APA

Peteinatos, D., Kontodimou, K., Andronis, V., & Kepaptsoglou, K. (2026). Integrated Optimization of Aircraft Line Maintenance: Scheduling under Uncertainty and Predictive Part Failure Modelling. https://doi.org/10.21203/rs.3.rs-9568678/v1

Source records