Optimasi Hidrolika Lumpur Pemboran Menggunakan Api Modified Power Law Pada Hole 8½ Sumur X Lapangan Mir

Novrianti Novrianti, Mursyidah Umar

Open source

DOI
10.22549/jeee.v4i2.635
Published
2015-10-30
Container
Journal of Earth Energy Engineering
Publisher
UIR Press
Open access
unknown

Credibility signals

uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.22549/jeee.v4i2.635,
  title = {Optimasi Hidrolika Lumpur Pemboran Menggunakan Api Modified Power Law   Pada Hole 8½ Sumur X Lapangan Mir},
  author = {Novrianti Novrianti and Mursyidah Umar},
  year = {2015},
  journal = {Journal of Earth Energy Engineering},
  doi = {10.22549/jeee.v4i2.635},
  url = {https://doi.org/10.22549/jeee.v4i2.635}
}

RIS

TY  - JOUR
TI  - Optimasi Hidrolika Lumpur Pemboran Menggunakan Api Modified Power Law   Pada Hole 8½ Sumur X Lapangan Mir
AU  - Novrianti Novrianti
AU  - Mursyidah Umar
PY  - 2015
JO  - Journal of Earth Energy Engineering
DO  - 10.22549/jeee.v4i2.635
UR  - https://doi.org/10.22549/jeee.v4i2.635
ER  - 

APA

Novrianti, N., & Umar, M. (2015). Optimasi Hidrolika Lumpur Pemboran Menggunakan Api Modified Power Law Pada Hole 8½ Sumur X Lapangan Mir. Journal of Earth Energy Engineering. https://doi.org/10.22549/jeee.v4i2.635

Source records