A Short-Term Load Forecasting Method for Traction Substations Based on Physical Information Collaboration and Spatiotemporal Correlation

Hanqi Wang, Zhaohui Tang, Da Tan, Fangyuan Zhou

Open source

DOI
10.3390/en19112514
Published
2026-05-23
Container
Energies
Publisher
MDPI AG
Open access
unknown

Credibility signals

uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.3390/en19112514,
  title = {A Short-Term Load Forecasting Method for Traction Substations Based on Physical Information Collaboration and Spatiotemporal Correlation},
  author = {Hanqi Wang and Zhaohui Tang and Da Tan and Fangyuan Zhou},
  year = {2026},
  journal = {Energies},
  doi = {10.3390/en19112514},
  url = {https://doi.org/10.3390/en19112514}
}

RIS

TY  - JOUR
TI  - A Short-Term Load Forecasting Method for Traction Substations Based on Physical Information Collaboration and Spatiotemporal Correlation
AU  - Hanqi Wang
AU  - Zhaohui Tang
AU  - Da Tan
AU  - Fangyuan Zhou
PY  - 2026
JO  - Energies
DO  - 10.3390/en19112514
UR  - https://doi.org/10.3390/en19112514
ER  - 

APA

Wang, H., Tang, Z., Tan, D., & Zhou, F. (2026). A Short-Term Load Forecasting Method for Traction Substations Based on Physical Information Collaboration and Spatiotemporal Correlation. Energies. https://doi.org/10.3390/en19112514

Source records