The 2025 Construction-Stage Collapse of the Jianzha Yellow River Super Bridge: A Document-Based Forensic Engineering Synthesis

Oğuzhan Çetindemir

Open source

DOI
10.3390/infrastructures11090311
Published
09
Container
Infrastructures
Publisher
Not recorded
Open access
yes

Credibility signals

uncertain Score 53/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.3390/infrastructures11090311,
  title = {The 2025 Construction-Stage Collapse of the Jianzha Yellow River Super Bridge: A Document-Based Forensic Engineering Synthesis},
  author = {Oğuzhan Çetindemir},
  year = {2026},
  journal = {Infrastructures},
  doi = {10.3390/infrastructures11090311},
  url = {https://doi.org/10.3390/infrastructures11090311}
}

RIS

TY  - JOUR
TI  - The 2025 Construction-Stage Collapse of the Jianzha Yellow River Super Bridge: A Document-Based Forensic Engineering Synthesis
AU  - Oğuzhan Çetindemir
PY  - 2026
JO  - Infrastructures
DO  - 10.3390/infrastructures11090311
UR  - https://doi.org/10.3390/infrastructures11090311
ER  - 

APA

Çetindemir, O. (2026). The 2025 Construction-Stage Collapse of the Jianzha Yellow River Super Bridge: A Document-Based Forensic Engineering Synthesis. Infrastructures. https://doi.org/10.3390/infrastructures11090311

Source records