A Refined Collaborative Scheduling Method for Multi-Equipment at U-Shaped Automated Container Terminals Based on Rail Crane Process Optimization

Yongsheng Yang, Shu Sun, Meisu Zhong, Junkai Feng, Furong Wen, Haitao Song

Open source

DOI
10.3390/jmse11030605
Published
03
Container
Journal of Marine Science and Engineering
Publisher
Not recorded
Open access
yes

Credibility signals

uncertain Score 53/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.3390/jmse11030605,
  title = {A Refined Collaborative Scheduling Method for Multi-Equipment at U-Shaped Automated Container Terminals Based on Rail Crane Process Optimization},
  author = {Yongsheng Yang and Shu Sun and Meisu Zhong and Junkai Feng and Furong Wen and Haitao Song},
  year = {2023},
  journal = {Journal of Marine Science and Engineering},
  doi = {10.3390/jmse11030605},
  url = {https://doi.org/10.3390/jmse11030605}
}

RIS

TY  - JOUR
TI  - A Refined Collaborative Scheduling Method for Multi-Equipment at U-Shaped Automated Container Terminals Based on Rail Crane Process Optimization
AU  - Yongsheng Yang
AU  - Shu Sun
AU  - Meisu Zhong
AU  - Junkai Feng
AU  - Furong Wen
AU  - Haitao Song
PY  - 2023
JO  - Journal of Marine Science and Engineering
DO  - 10.3390/jmse11030605
UR  - https://doi.org/10.3390/jmse11030605
ER  - 

APA

Yang, Y., Sun, S., Zhong, M., Feng, J., Wen, F., & Song, H. (2023). A Refined Collaborative Scheduling Method for Multi-Equipment at U-Shaped Automated Container Terminals Based on Rail Crane Process Optimization. Journal of Marine Science and Engineering. https://doi.org/10.3390/jmse11030605

Source records