Integrated Scheduling of Handling Equipment in Automated Container Terminal Considering Quay Crane Faults

Taoying Li, Quanyu Dong, Xulei Sun

Open source

DOI
10.3390/systems12110450
Published
2024-10-25
Container
Systems
Publisher
MDPI AG
Open access
unknown

Credibility signals

uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.3390/systems12110450,
  title = {Integrated Scheduling of Handling Equipment in Automated Container Terminal Considering Quay Crane Faults},
  author = {Taoying Li and Quanyu Dong and Xulei Sun},
  year = {2024},
  journal = {Systems},
  doi = {10.3390/systems12110450},
  url = {https://doi.org/10.3390/systems12110450}
}

RIS

TY  - JOUR
TI  - Integrated Scheduling of Handling Equipment in Automated Container Terminal Considering Quay Crane Faults
AU  - Taoying Li
AU  - Quanyu Dong
AU  - Xulei Sun
PY  - 2024
JO  - Systems
DO  - 10.3390/systems12110450
UR  - https://doi.org/10.3390/systems12110450
ER  - 

APA

Li, T., Dong, Q., & Sun, X. (2024). Integrated Scheduling of Handling Equipment in Automated Container Terminal Considering Quay Crane Faults. Systems. https://doi.org/10.3390/systems12110450

Source records