DiSSCo Prepare Deliverable D9.6 Compilation of Construction Masterplan
- DOI
- 10.34960/cy1m-b238
- Published
- 2023
- Container
- Not recorded
- Publisher
- DiSSCo Prepare
- Open access
- no
Credibility signals
limited evidence Score 43/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Cite this work
BibTeX
@article{allodium:10.34960/cy1m-b238,
title = {DiSSCo Prepare Deliverable D9.6 Compilation of Construction Masterplan},
author = {Loo, Tina and BENVENUTI, MARCO and CECCHI, LORENZO and Innocenti, Gianna and Biaggini, Marta and Bellucci, Luca and MOGGI CECCHI, VANNI and Di Vincenzo, Fabio and Rossi de Gasperis, Sarah},
year = {2023},
doi = {10.34960/cy1m-b238},
url = {https://doi.org/10.34960/cy1m-b238}
}RIS
TY - JOUR TI - DiSSCo Prepare Deliverable D9.6 Compilation of Construction Masterplan AU - Loo, Tina AU - BENVENUTI, MARCO AU - CECCHI, LORENZO AU - Innocenti, Gianna AU - Biaggini, Marta AU - Bellucci, Luca AU - MOGGI CECCHI, VANNI AU - Di Vincenzo, Fabio AU - Rossi de Gasperis, Sarah PY - 2023 DO - 10.34960/cy1m-b238 UR - https://doi.org/10.34960/cy1m-b238 ER -
APA
Tina, L., MARCO, B., LORENZO, C., Gianna, I., Marta, B., Luca, B., VANNI, M. C., Fabio, D. V., & Sarah, R. D. G. (2023). DiSSCo Prepare Deliverable D9.6 Compilation of Construction Masterplan. https://doi.org/10.34960/cy1m-b238
Source records
- datacite · retrieved 2026-09-26T01:15:34.690Z