Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm
- DOI
- 10.4995/ijpme.2021.16084
- Published
- 2022-01-31
- Container
- International Journal of Production Management and Engineering
- Publisher
- Universitat Politecnica de Valencia
- Open access
- unknown
Credibility signals
uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- supportingDOI registered: A matching record was returned by Crossref.
- supportingDOI resolves: A matching record was returned by Crossref.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredOpen access status: Not checked or no result supplied; no credibility inference made.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- supportingMetadata completeness: All 6 scored descriptive metadata groups are present.
Cite this work
BibTeX
@article{allodium:10.4995/ijpme.2021.16084,
title = {Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm},
author = {Mohammad Zakaraia and Hegazy Zaher and Naglaa Ragaa},
year = {2022},
journal = {International Journal of Production Management and Engineering},
doi = {10.4995/ijpme.2021.16084},
url = {https://doi.org/10.4995/ijpme.2021.16084}
}RIS
TY - JOUR TI - Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm AU - Mohammad Zakaraia AU - Hegazy Zaher AU - Naglaa Ragaa PY - 2022 JO - International Journal of Production Management and Engineering DO - 10.4995/ijpme.2021.16084 UR - https://doi.org/10.4995/ijpme.2021.16084 ER -
APA
Zakaraia, M., Zaher, H., & Ragaa, N. (2022). Solving stochastic multi-manned U-shaped assembly line balancing problem using differential evolution algorithm. International Journal of Production Management and Engineering. https://doi.org/10.4995/ijpme.2021.16084
Source records
- crossref · retrieved 2026-11-10T11:59:03.058Z