Technical note: Design, construction, automation, and first-principles calibration of a low volume He measurement line

James R. Metcalf, Rebecca M. Flowers

Open source

DOI
10.5194/gchron-8-447-2026
Published
2026-08-10
Container
Geochronology
Publisher
Copernicus GmbH
Open access
unknown

Credibility signals

uncertain Score 64/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.

Show all credibility signals

Cite this work

BibTeX

@article{allodium:10.5194/gchron-8-447-2026,
  title = {Technical note: Design, construction, automation, and first-principles calibration of a low volume He measurement line},
  author = {James R. Metcalf and Rebecca M. Flowers},
  year = {2026},
  journal = {Geochronology},
  doi = {10.5194/gchron-8-447-2026},
  url = {https://doi.org/10.5194/gchron-8-447-2026}
}

RIS

TY  - JOUR
TI  - Technical note: Design, construction, automation, and first-principles calibration of a low volume He measurement line
AU  - James R. Metcalf
AU  - Rebecca M. Flowers
PY  - 2026
JO  - Geochronology
DO  - 10.5194/gchron-8-447-2026
UR  - https://doi.org/10.5194/gchron-8-447-2026
ER  - 

APA

Metcalf, J. R., & Flowers, R. M. (2026). Technical note: Design, construction, automation, and first-principles calibration of a low volume He measurement line. Geochronology. https://doi.org/10.5194/gchron-8-447-2026

Source records