Risk-Oriented Methodology for Contractor Management in the Construction of Optical Lines, Including Modeling of Crew Productivity and Logistics Delays in PERT/CPM Networks and Calibration of Contractual Incentives/Penalties
- DOI
- 10.59324/ejiss.2025.1(6).09
- Published
- 2025-11-27
- Container
- European Journal of Innovative Studies and Sustainability
- Publisher
- Not recorded
- Open access
- yes
Credibility signals
limited evidence Score 45/100 under policy 1.0.0. This is a metadata assessment, not a judgment of the paper's conclusions.
Show all credibility signals
- cautionDOI registered: No matching Crossref record was present in this response.
- cautionDOI resolves: No matching Crossref record was present in this response.
- not scoredDirectory of Open Access Journals: No matching DOAJ record was present in this response. No allow-list match; this is not evidence of low credibility.
- not scoredMEDLINE indexed: Not checked or no result supplied; no credibility inference made.
- not scoredOpenAlex core source: Not checked or no result supplied; no credibility inference made.
- not scoredKnown publisher allow-list: Not checked or no result supplied; no credibility inference made.
- not scoredROR affiliation: Not checked or no result supplied; no credibility inference made.
- not scoredRetraction Watch retraction: No retraction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch expression of concern: No expression of concern notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch correction: No correction notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- not scoredRetraction Watch reinstatement: No reinstatement notice matched this DOI in the deployed snapshot. No matching event found; coverage may be incomplete.
- supportingOpen access status: Normalized open-access status: open.
- not scoredPublication license: Not checked or no result supplied; no credibility inference made.
- not scoredPublication version: A publication version was supplied but is not scored.
- cautionMetadata completeness: 5 of 6 scored descriptive metadata groups are present; missing fields increase uncertainty.
Cite this work
BibTeX
@article{allodium:10.59324/ejiss.2025.1-6-.09,
title = {Risk-Oriented Methodology for Contractor Management in the Construction of Optical Lines, Including Modeling of Crew Productivity and Logistics Delays in PERT/CPM Networks and Calibration of Contractual Incentives/Penalties},
author = {Mykola Gomzov},
year = {2025},
journal = {European Journal of Innovative Studies and Sustainability},
doi = {10.59324/ejiss.2025.1(6).09},
url = {https://doi.org/10.59324/ejiss.2025.1(6).09}
}RIS
TY - JOUR TI - Risk-Oriented Methodology for Contractor Management in the Construction of Optical Lines, Including Modeling of Crew Productivity and Logistics Delays in PERT/CPM Networks and Calibration of Contractual Incentives/Penalties AU - Mykola Gomzov PY - 2025 JO - European Journal of Innovative Studies and Sustainability DO - 10.59324/ejiss.2025.1(6).09 UR - https://doi.org/10.59324/ejiss.2025.1(6).09 ER -
APA
Gomzov, M. (2025). Risk-Oriented Methodology for Contractor Management in the Construction of Optical Lines, Including Modeling of Crew Productivity and Logistics Delays in PERT/CPM Networks and Calibration of Contractual Incentives/Penalties. European Journal of Innovative Studies and Sustainability. https://doi.org/10.59324/ejiss.2025.1(6).09
Source records
- hal · retrieved 2026-09-25T07:49:55.853Z