Skip to contentRetraction notices
Key technology of constructing the cut-off wall under the foundation with large depth soils layer in Tibet's Zhikong hydropower station
- Type
- Retraction
- Notice date
- 5/27/2011 0:00
- Journal
- 2011 International Conference on Electric Technology and Civil Engineering: ICETCE 2011
- Publisher
- IEEE: Institute of Electrical and Electronics Engineers
- Notice DOI
- 10.1109/icetce.2011.5775327
- Original paper DOI
- 10.1109/icetce.2011.5775327
Reasons